China Guangzhou Road Tunnel
Posted by:Webmaster
2021-11-12 10:28:49 . 154reads

Client:

China railway tunnel co. LTD
The pearl river delta inter-city Pazhou spur line pzh-i area 1 project department

Year/ Month:

2020/02

Specification of Segment Ring:

Φ13.1×0.55T×1.5L(10P/R)

Φ8.8×0.4T×1.8L(7P/R)

Type of mould:

Universal ring 2 Set(s)

Universal ring 2 Set(s)

Vibration Method:

Pneumatic vibrator