China Anhui River-crossing Tunnel
Posted by:Webmaster
2021-11-12 14:21:41 . 176reads

Client:

China railway 14th Bureau group co-Wuhu Branch

Year/ Month:

2020/09

Specification of Segment Ring:

Φ14.5×0.6T×2L (10P/R)

Type of mould:

Standard Ring 5 Set(s)

Vibration Method:

Pneumatic vibrator