Xiamen Metro line II- Subsea tunnel,
Posted by:Webmaster
2015-04-29 15:09:22 . 2913reads

Client:China Rail group 24 precast yard

Project:Xiamen city metro- Line 2

φ6700××350×1500(6P/R)double tapper ring- 4 set

Vibration method: Carrousel system with vibration table

 

Unicrane has award to desgin and supply of segment mould for the first subsea tunnel for MRT projec in China.  This subsea tunnel is located in Xiamen China for line 2 (please refer to orange colour), the ring id designed with OD6700mm x 1500mm x 350mm (5+1). mould has to desgin to suit the current carrousel system with total amount of 4 sets.