Client: China Railway Construction Corporation (CRCC)
Project:Metro of Wǔhàn
Date:2015/07
Φ6.2×0.35T×1.5L(6P/R)-double tappered ring- 4 set
Vibration method:Pnuematic vibration
Client: China Railway Construction Corporation (CRCC)
Project:Metro of Wǔhàn
Date:2015/07
Φ6.2×0.35T×1.5L(6P/R)-double tappered ring- 4 set
Vibration method:Pnuematic vibration