China Shanghai City Metro
China Shanghai City Metro
2021-11-08 11:28:57
Client:Pudong Shanghai concrete product Co., LtdYear/ Month:2017/7Specification of Segment Ring:Φ6.6×0.35T×1.2L ( 6P/R )Type of mould:Standard Ring SetVibration Method:Vibration table
 China  Shenyang Sewage tunnel
China Shenyang Sewage tunnel
2021-11-08 11:21:10
Client:Shenyang Hua Fei Pipe Industry Co LtdYear/ Month:2017/7Specification of Segment Ring:Φ4×0.25T×1.2L( 6P/R )Type of mould:Left Tapper ring 1 SetRight Tapper ring 2 SetVibration Method:Vibration table
 Award of Hong Kong MTRC 1128 from Dragages & Bouygues JV
Award of Hong Kong MTRC 1128 from Dragages & Bouygues JV
2015-06-02 00:08:31
Client:Dragages & Bouygues JVProject:Hong Kong MTRC 1128φ7100×1500 x 300(7P/R)double tappered ring- 3 setVibration method: Pnuematic vibrator attached underneath the mould.* Anchor Gasket desgin mould, First time in Hong Kong.
 Award for Indonesia Jakarta Metro Proejct package CP106
Award for Indonesia Jakarta Metro Proejct package CP106
2015-04-29 15:46:34
Client:Mitsui-SumitomoProject:Indonesia Jakarta Metro CP106φ6650××300×1500(6P/R)Straight ring- 5 setchangable single tapper mould to left & right - 1 setVibration method: Electrical vibrator attached underneath the mould. After the completion of design and supply of segmet mould for Jakarta MRT CP104~105 (Shimizu & Obayashi Wika Jaya Konstruksi JV), Unicrane has further awarded the project for CP106 (Mitsui-Sumitomo). Both underground packages in Jakarta Indonesia are awarded by Unicrane. A changeable tapper mould for straight, ring and left is not any standard mould and commond to see, Unicrane is able to design and fabricated with same high tolerance requirement as standard type. 
 Xiamen Metro line II- Subsea tunnel,
Xiamen Metro line II- Subsea tunnel,
2015-04-29 15:09:22
Client:China Rail group 24 precast yardProject:Xiamen city metro- Line 2φ6700××350×1500(6P/R)double tapper ring- 4 setVibration method: Carrousel system with vibration table Unicrane has award to desgin and supply of segment mould for the first subsea tunnel for MRT projec in China.  This subsea tunnel is located in Xiamen China for line 2 (please refer to orange colour), the ring id designed with OD6700mm x 1500mm x 350mm (5+1). mould has to desgin to suit the current carrousel system with total amount of 4 sets.
« 1 ... 29 30 31 (32) 33 34 35 ... 39 »