Award of Chongqin city Metro segment mould 7 sets.
2014-10-20 13:56:49
Client:Xinke ConstructionProject:Chongqing city metroφ6600××350×1500(6P/R)double tapper ring- 7 setVibration method: Vibration table

Award of Shenyang City metro segment mould- Additional 8 set
2014-09-24 10:50:00
Client:Shenyang Municipal Construction Engineering CompanyProject:Shengyang city metroφ6000××300×1200(6P/R)straight ring- 6 setφ6000××300×1200(6P/R)right ring- 1 setφ6000××300×1200(6P/R)left ring- 1 setVibration method: Vibration table

Award of Harbin city metro segment mould 7 sets + vibration table 2 sets
2014-09-24 10:45:23
Client:Huage Concrete Precast Co., LtdProject:Harbin city metroφ6000××300×1200(6P/R)straight ring- 7 setVibration table- 2 setVibration method: Vibration table

Award of Guangzhou City Metro- Segment mould x 10 set
2014-08-27 14:18:15
Client:Guangdong Rongonconstruction building precastProject:Guabgzhou city metroφ6000××300×1500(6P/R)straight ring- 6 setφ6000××300×1500(6P/R)right tappered ring- 2 setφ6000××300×1500(6P/R)left tappered ring- 2 setVibration method: Intsert vibration

Award of Singapore Thomson Line T207 section
2014-06-14 08:40:00
Unicrane has awarded the project for desgin and fabricate of steel segment mould for Shimizu corperation. the desgin of the segment is to cast with steel firber, similar like the mould we supply for MMC GAMUDA previously in last year. The ring is consisted by 8 pieces of segment.This project is using total 5 set of moulds.Client:Shimizu Coperation (Singapore).Project:Woodlands Avenue-Springleaf Station tunnel construction(Contract T207)φ 63500mm x 1400mm x 275mmStraight ring x 3 setsRight taper ring x 1 setLeft taper ring x 1 setFollowing is the information of T207 section: Japan-based Shimzu is awarded Sing$189.8 million Woodlands Avenue-Springleaf Station tunnel construction(Contract T207) in the northern section of the alignment, with completion due by 2020. The company was previously involved in the design, construction and completion of the Circle Line/Downtown Line 1 (DTL1) tunnels crossing under the Marina Bay Reservoir.