
Metro of Shanghai
2017-08-15 11:33:16
Client: CCCC THIRD HARBOR ENGINEERING CO., LTD
Date:2016/01Φ6.6×0.35T×1.2L(6P/R)straight ring- 6 setright ring- 1 set
left ring- 1 setVibration table- 1 set
Date:2016/01Φ6.6×0.35T×1.2L(6P/R)straight ring- 6 setright ring- 1 set
left ring- 1 setVibration table- 1 set

Guangzhou Western Tunnel for electricity
2017-08-15 11:10:00
Client: Guangzhou Huasui Precast Concrete Co., Ltd.
Date:2016/01Φ4.1×0.25T×1.2L(6P/R)- double tappered ring 2 setΦ4.1×0.25T×1 L(6P/R)- double tappered ring 1 set
Date:2016/01Φ4.1×0.25T×1.2L(6P/R)- double tappered ring 2 setΦ4.1×0.25T×1 L(6P/R)- double tappered ring 1 set

Hohhot
2017-08-15 11:00:00
Client: China Railway 11th Group Co., Ltd.
Date:2015/12Φ6.2×0.35T×1.5L(6P/R)- double tappered ring- 12 set
Date:2015/12Φ6.2×0.35T×1.5L(6P/R)- double tappered ring- 12 set

Metro of Shenyang
2017-08-15 10:49:13
Client: SHENYANG MUNICIPAL
Date:2015/12Φ4×0.25T×1.2L(6P/R):straight ring- 6 set
right ring- 2 set
left ring- 1 set
Date:2015/12Φ4×0.25T×1.2L(6P/R):straight ring- 6 set
right ring- 2 set
left ring- 1 set

ANDO JAPAN
2017-08-15 10:45:52
Client: ANDO JAPAN
Date:2015/12Φ12.4×0.45T×2L( 9P/R )- straight ring- 3 set
Date:2015/12Φ12.4×0.45T×2L( 9P/R )- straight ring- 3 set