
Metro of Beijing
2017-08-14 11:21:11
Client: Beijing Construction Engineering Co., Ltd.
Date:2015/08Φ6.4×0.3T×1.2L(6P/R):straight ring- 8 set
right ring- 2 set
left ring- 2 set
Date:2015/08Φ6.4×0.3T×1.2L(6P/R):straight ring- 8 set
right ring- 2 set
left ring- 2 set

Metro of Xuzhou
2017-08-14 11:11:25
Client:Xuzhou xintong precast concrete component Co., Ltd.
Date:2015/08Φ6.2×0.35T×1.2L(6P/R)-straight ring- 6 set
right ring- 2 set
left ring- 2 set
Date:2015/08Φ6.2×0.35T×1.2L(6P/R)-straight ring- 6 set
right ring- 2 set
left ring- 2 set

Metro of Changsha
2017-08-14 10:56:55
Client: Hunan Hengsheng Ruitong New Building Meterials Co., Ltd.
Date:2015/07Φ6×0.3T×1.5L(6P/R):straight ring-10 setright ring-1 setleft ring-1 set
Date:2015/07Φ6×0.3T×1.5L(6P/R):straight ring-10 setright ring-1 setleft ring-1 set

Cross Harbour Tunnel of HK (From Tuen Mun to Chek Lap Kok)
2017-08-14 10:50:00
Client: Dragages HK
Date:2015/07Φ13.5×0.55T×2.2L( 9P/R )-double tappered ring- 1 set
Date:2015/07Φ13.5×0.55T×2.2L( 9P/R )-double tappered ring- 1 set

Metro of Wǔhàn
2017-08-14 10:40:00
Client:China Railway Fist Group Co., Ltd.Project:Metro of WǔhànDate:2015/07Φ6.2×0.35T×1.5L(6P/R)- double tappered ring 14 set