Metro of  Changzhou
Metro of Changzhou
2017-08-14 10:30:00
Client: CHANGZHOU CRCC-CZUC ARTIFACTS Co., LTD
Project:Metro of  ChangZhou
Date:2015/07Φ6.2×0.35T×1.2L(6P/R)-double tappered  ring- 2 set
 Metro of Wǔhàn
Metro of Wǔhàn
2017-08-14 10:30:00
Client: China Railway Construction Corporation (CRCC)
Project:Metro of Wǔhàn
Date:2015/07Φ6.2×0.35T×1.5L(6P/R)-double tappered  ring- 4 set
 Mochizukisamu River Japan
Mochizukisamu River Japan
2017-08-14 10:20:00
Client: Nippon Hume IntetnationalNippon Hume IntetnationalProject: River improvement-riparian works of Mochizukisamu RiverDate:2015/06Φ5.25×0.225T×1.2L(6P/R )-straight ring- 1 set
 Hong Kong TuenMun ChekLapKok Link subsea tunnel section
Hong Kong TuenMun ChekLapKok Link subsea tunnel section
2014-05-19 13:50:00
Client:Hong Kong Dragages & Bouygues JVProject:Hong Kong TuenMun Chek Lap Kok Link Northern Connection subsea tunnel sectionφ13500×φ12400×550×2200(9P/R)*6 Setφ17000×φ15600×700×1700(12P/R)*2 SetOne of Aisa’s major tunnel constructions in 2014 is the Hong Kong- Zhuhai- Macao bridge related Hong Kong project. (Following information are reference form Web- Tunnel talk) https://tunneltalk.com/Hong-Kong-05Sep2013-New-undersea-highway-tunnel-to-link-the-New-Territories-with-Chek-Lap-Kok-Airport-on-Lautau-Island.php A design-build contract worth an equivalent of €1.15 billion (US$1.5 billion) is awarded by the Hong Kong Government to a joint venture of Dragages Hong Kong and Bouygues Travaux Publics, two subsidiaries of Bouygues Construction of France, for a new 4.2km undersea road tunnel in Hong Kong to link Tuen Mun in the New Territories on the mainland, with Hong Kong's Chek Lap Kok Airport on Lantau Island (Figs 1 and 2).  The TM-CLKL will become a 4.2km twin-tube subsea tunnel, with two traffic lanes in each 14m diameter tube. The project also includes construction of two cut-and-cover approach tunnels of 530m and 670m. The new tunnel link to Lantau Island (TM-CLKL) will connect the New Territories to the eastern end of the Hong Kong Link Road. Delivery of the civil works is scheduled for the end of 2018. More than 1,000 employees will be working on the project at peak periods.
 Hong Kong MTR Contract 1107 VMT 3D Inspection
Hong Kong MTR Contract 1107 VMT 3D Inspection
2014-05-19 11:20:00
Hong Kong MTR Contract 1107 VMT 3D Inspection 
« 1 ... 12 13 14 (15) 16 »